RECYCLING PROGRAM STATUS REPORT AS OF 5/18/98
Executive
Summary
We
implemented pilot programs in the Engineering Building, DuSable Hall, Watson
Hall and Williston Hall. In the
Engineering Building we implemented a full central collection system. Each occupant was issued a new desk side
paper recycling bin and a mini garbage bin.
Each occupant is responsible for carrying their trash and recyclables to
a central collection location. In
Watson Hall we implemented central collection for recyclables. Building Service Workers continue to collect
trash from the desk side and now collect the recyclables from the central
locations. In DuSable we implemented
central collection systems in the public areas and installed stacking recycle
bins in the classrooms next to the waste basket. Building Service Workers collect from the central areas and the
classrooms. In Williston Hall we
implemented full desk side service.
Building Service Workers collect both trash and recyclables from the
desk side in each office.
The
pilot program buildings were fully implemented by the end of February. Prior to implementation we analyzed two
waste streams from each pilot building to determine the composition of the
waste we were sending to the landfill. After the pilot programs were implemented and had been operating
for some time, we analyzed two more waste streams from each pilot building to
determine the impact of the recycling programs on the composition of the waste
were are sending to the landfill. We
also analyzed the effects on Building Service Workers’ time in terms of labor
costs. The results are summarized in
the table below.
|
Location |
Impact on Waste Stream |
Incremental Annual Labor
Cost |
Annual Labor Savings |
|
Watson
Hall |
28% reduction |
$4,182 |
|
|
Williston
Hall |
9% reduction |
$6,775 |
|
|
DuSable
Hall |
21% reduction |
|
$1,623 |
|
Engineering
Building |
34% reduction |
|
$4,740 |
The
Physical Plant assumed full responsibility for administering the Recycling
Program by the middle of March and the Student Association Recycling Center
closed. The Student Association did not
keep monthly records of the amount of materials recycled. From their annual total, we computed a
simple average of 35 tons of paper per month.
The April report provided by Waste Management indicated that we recycled
67.3 tons during that month.
The
average monthly bill for trash removal costs (garbage only) was $19,600 prior
to the time that the Physical Plant assumed responsibility for the Recycling
Program. Since that time we
re-evaluated the service requirements for trash and the new monthly rate will
be approximately $15,000. The monthly
bill for removal of recyclable materials is $2,400. The approximate savings to the University is $19,800 for the nine
month school year. The waste collection
contract for trash and recyclable materials will be re-bid and implemented
during the FY99 year. We anticipate a
significant cost savings will be realized after that process.
Introduction
The
pilot program buildings were fully implemented by the end of February. The Physical Plant assumed full
responsibility for administering the recycling program toward the middle of
March and the Student Association Recycling Center was closed.
In
the non-pilot buildings, Building Service Workers are responsible for moving
the blue toters to a central location and Waste Management collects the
material from those locations. The
Student Association did not keep monthly records of the amount of materials
recycled. From their annual totals we
computed a simple average of 35 tons of paper per month. The April report provided by Waste
Management indicated that we recycled 67.3 tons during that month.
Impact on
Waste Removal Costs
Prior
to the Physical Plant assuming responsibility for administration of the
Recycling Program, the monthly trash removal costs were averaging $19600 per
month for the entire campus. Since that
time, we have re-evaluated the service on trash removal and the monthly bill
will be reduced to approximately $15,000 per month. The monthly bill for recycling is $2,400. This will vary slightly because we have several
cardboard dumpsters that are emptied on an as-needed basis. The approximate savings to the University is
$19,800 during the nine month school year.
The Waste collection contract for trash and recyclables will be re-bid
and implemented during the FY99 fiscal year.
We hope to realize a significant costs savings after that process.
Results of
Pilot Study
Williston Hall
Building
Service Workers in Williston Hall are collecting both garbage and recycling
from the desk side. Garbage is
collected daily, and recycling is collected three times per week. Prior to the implementation of the recycling
program it required about 2.5 hours per night per Building Service Worker to
collect the trash.
Impact on Building Services
We
studied the time required to collect the waste from the desk side before and
after the implementation of the recycling program. The results are summarized below. Times are expressed in hours per night per Building Service
Worker. Annual labor cost is based on
three nights per week for 49 weeks
per year.
Time
Required pre-implementation 2.40
Time
required post-implementation 3.75
Increased
(decreased) time 1.35
hours per night per Building Service Worker
Nights
per week
3.00
Average hourly rate $11.38
Building
Service Workers 3.00
Annual
Labor Cost (Savings)
$6,775
Impact on Waste Stream
We
audited the waste stream in Williston four times to determine the composition
of the waste which was being sent to the landfill. The recyclable components of the waste stream were reduced by
about 9% after implementation of the pilot program.
Building
Service Workers in Watson Hall are collecting waste from the desk side garbage
cans and from the central collection units on a daily basis. There are 15 central collection units for
garbage, paper and commingled containers placed throughout this building. Prior to the implementation of the pilot
program it required about 2.75 hours per night per Building Service Worker to
collect the trash. After
implementation of the pilot program it requires 3.5 hours per night to collect
the trash and recyclables. There are 15
central collection units placed throughout Watson Hall.
Impact on Building Services
We
studied the time required to collect the waste before and after the
implementation of the recycling program.
The results are summarized below.
Times are expressed in hours per night per Building Service Worker. Annual labor cost is based on five nights
per week for 49 weeks per year.
Time
Required pre-implementation 2.75
Time
required post-implementation 3.50
Increased
(decreased) time
0.75 hours per night per Building Service Worker
Nights
per week 5.00
Average
hourly rate $11.38
Building
Service Workers 2.00
Annual
Labor Cost (Savings) $4,182
Impact on Waste Stream
We
audited the waste stream in Watson Hall four times to determine the composition
of the waste which was being sent to the landfill. There are 15 central collection units placed throughout Watson
Hall. The recyclable components of the
waste stream were reduced by about 28% after implementation of the pilot
program.
DuSable Hall
DuSable
Hall is primarily a classroom building.
We removed the large waste containers from the hallways and central
areas and replaced them with central collection units for garbage, paper and
commingled containers. There are 17
central collection units and 12 stand alone bins for commingled recyclables
placed throughout DuSable in the public areas. We also placed stacking recycle bins in the classrooms for paper
and commingled recyclables next to the waste cans. We hired student employees to collect the trash left by students
on desks and floors in the classrooms and sort it into the classroom recycle
bins and trash cans. Historically, the
Building Service staff spent a great deal of time collecting these materials in
the classrooms.
Impact on Building Services
We
studied the time required to collect the waste before and after the
implementation of the recycling program.
The results are summarized below.
Times are expressed in hours per night per Building Service Worker. Annual labor cost is based on five nights
per week for 35 weeks per year
because this is primarily a classroom building.
Time
Required pre-implementation 1.10
Time
required post-implementation 0.67
Increase
(decreased) time (0.43) hours per night per Building
Service Worker
Nights per week 5.00
Average
hourly rate $11.38
Building
Service Workers 4.00
Student Worker $ 5.15 @ 2 hours per night/49 weeks
Annual Labor Cost (Savings) ($1,623)
Impact on Waste Stream
We
audited the waste stream in DuSable Hall four times to determine the
composition of the waste which was being sent to the landfill. There are 17 central collection units placed
throughout Watson Hall and 12 stand alone commingled recycle bins. The recyclable components of the waste
stream were reduced by about 21% after implementation of the pilot program.
Engineering Building
In
the Engineering Building we implemented a full central collection system for
all waste. Each occupant was issued a
new desk side paper recycling bin and a mini garbage bin. We removed the standard garbage cans from
the office. Each occupant is
responsible for taking their garbage and their recyclables to a central
location. We studied the time required
to collect the waste from the desk side before implementation and the time to
collect from central units after the implementation of the recycling
program. The results are summarized
below. Times are expressed in hours per
night per Building Service Worker.
Annual labor cost is based on five nights per week for 52 weeks per
year.
Impact on Building Services
We
studied the time required to collect the waste before and after the
implementation of the recycling program.
The results are summarized below.
Times are expressed in hours per night per Building Service Worker. Annual labor cost is based on five nights
per week for 49 weeks per year.
Time
Required pre-implementation 1.18
Time
required post-implementation 0.33
Increased
(decreased) time 0.85
hours per night per Building Service Worker
Nights per week 5.00
Average hourly rate $11.38
Building
Service Workers 2.00
Annual
Labor Cost (Savings)
($4,470)
Impact on Waste Stream
We
audited the waste stream in the Engineering Building four times to determine
the composition of the waste which was being sent to the landfill. There are 11 central collection units placed
throughout the Engineering Building.
The recyclable components of the waste stream were reduced by about 34%
after implementation of the pilot program.
Since no recycle bins were placed in the classrooms here, this number
represents the change due to central collection for the office and public
areas.